Wedding in South-West-England on 03.-05.09.2004
De En
Bilder

 

To watch the pictures click on the shown picture (left or right area), the buttons with the arrows or the miniature pictures below or hover over them with the mouse.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27) (28) (29) (30) (31) (32) (33) (34)

Wedding in South-West-England on 03.-05.09.2004
A short trip for a weekend to the wedding of a dear friend in South-West-England on 03.-05.09.2004
I rode for a weekend to England with my SR because of the wedding of a dear friend
Originally I wanted to go there by my XT. But this got an electrical defect two days before start:
The generator cable has come into the chain. One wire was cut another damaged.
The headlight was without function now even the loading of the batterie. After the repair of the cable it didnt't properly work again. But this I could not finally check until my return from England: It was a loose contact in the lamp. Temporary it worked and temporary it didn't.
So I did the ride with my SR.
At all 1740 km. Around 10 hours driving time there and another 10 hours back.
There are enough filling stations along the route to ride 150-200 km stages. Just twice I had to put on reserve. In the other cases a filling station was near.
For me the best ferry was the night ferry Calais to Dover.

Thursday/Friday
Journey there
(1)
 
(2)
 
(3)
 
(4)
 
(5)
 
(6)
 
(7)
 
(8)
 
(9)
 
Friday
Pre wedding party
(10)
 
(11)
 
Saturday
A tour in Taunton
(12)
 
(13)
 
(14)
 
Saturday
The wedding + the party
(15)
 
(16)
 
(17)
 
(18)
 
(19)
 
(20)
 
(21)
 
(22)
 
(23)
 
(24)
 
(25)
 
Sunday/Monday
Journey back
(26)
 
(27)
 
(28)
 
(29)
 
(30)
 
(31)
 
(32)
 
(33)
 
(34)
 

SRG

Seitenanfang

Home


Impressum  •  Datenschutzerklärung